Road Conditions Update-Barron River bridge (Kuranda)-single-lane operation to remain place

Inspections on the Barron River bridge at Kuranda on 23 May 2024 have identified an issue with a Macalloy bar on the bridge. The Macalloy post-tensioning bars were retrofitted to provide additional strength after the bridge opened to traffic in 1963.

As a precaution, a single-lane operation of the bridge will remain in place to ensure safety for the crew and road users. Inspections are continuing and our technical experts are assessing what the issue means for the bridge and how it can be managed. 

Variable message signs (VMS) are in place to inform motorists about changed traffic conditions. 

Motorists should expect minor delays and plan their journeys accordingly.

Thank you for your patience while we carry out more inspections and assessments. We will update you when more information becomes available.

The planning study for a long-term solution for the Barron River bridge is progressing and expected to be completed in late 2024.

Detailed design and construction of a long-term solution are currently unfunded. 

For up-to-date information about the state-controlled road network, check QLDTraffic or call 13 19 40.