NSW Traffic Alert: Changed traffic conditions along the M7 Motorway

Source: Transport for NSW (26.02.2025)

 

There will be temporary changed traffic conditions along the M7 Motorway between the M5 Motorway and Richmond Road, weather permitting, including:

  • northbound and southbound right lane closures
  • reduced lane width
  • reduced speed limit. 

The bridge deck concrete pour activities will take place from 8pm Friday evening to 5am Monday morning, subject to work progress, approvals and wet weather. Please refer to the table below outlining proposed timing of works.

Oversize Overmass (OSOM) under notice will be detoured during these works. Diversion routes at each location will be notified in advance. 

Class 2 vehicles will not be detoured and will remain on the M7 Motorway.

Vehicles travelling under a permit must not travel off the approved route listed in their permit unless an updated permit is obtained from the National Heavy Vehicle Regulator (NHVR).

Road users will be notified of traffic changes via variable message signs (VMS) and on-site signage. 

Six month look ahead - bridge deck concrete pour

For more information on this work call the 24/7 project information line on 1800 712 712 or email info@m7integrationproject.com.au

For the latest traffic information, visit www.livetraffic.com, call 132 701, or download the Live Traffic NSW app or download the Linkt app and switch on road alerts for M7 roadworks.