FNQ-Bridge servicing works: McLeod River bridge on Mulligan Highway
The Department of Transport and Main Roads (TMR) will be servicing McLeod River bridge on the Mulligan Highway between Mt Molloy and Lakeland as part of maintenance works.
Bridge servicing is regularly carried out to ensure the continued safety and reliability of bridges on the state-controlled road network.
The servicing works will require intermittent full bridge closures from Monday 29 August – Thursday 1 September 2022 between 7 am and 4 pm. The bridge will be closed for one-hour periods with 15-minute openings during the following times:
Closed 8.00am-9.00am Open 9.00am-9.15am
Closed 9.15am-10.15am Open 10.15am-10.30am
Closed 10.30am-11.30am Open 11.30am-11.45am
Closed 11.45am-12.45pm Open 12.45pm-1.00pm
Closed 1.00pm-2.00pm Open 2.00pm-2.15pm
Closed 2.15pm-3.00pm Open 3.00pm onwards
Timeframes may be subject to change depending on weather conditions.
TMR has arrangement in place to provide emergency access if required.
For the safety of road users and maintenance crews, changed traffic conditions will be in place including temporary full closures under coordination of traffic controllers while the works are carried out. Road users should plan their travel accordingly.
Variable Message Signs will be in place prior to the closures to allow motorists ample opportunity to plan their travel.
More information about road conditions across Queensland’s state-controlled road network is available via the www.QLDTraffic.qld.gov.au website or 13 19 40 Information services.
If you require further information about these works, please do not hesitate to contact me by email at cairns.office@tmr.qld.gov.au or by telephone on 4045 7191.